Whew! We are still currently renovating my office/workplace. It’s a total mess right now. All of my figures were temporarily transferred to my entertainment area so that we could have more space to work. There are a total of 6 figure cabinets that needs to be installed. We just started today and so far we already installed 2 of them.

The overall woodwork is wrapped with a carbon fiber “laminate” which somewhat makes the cabinet much more appealing. We also already installed the wiring needed for the LED lights. I told my interior designer that I don’t want to see any wires so we had to basically create a hidden passage for the electrical wires inside the cabinet.

There are 4 more display cabs remaining and I can’t wait to see them completed. Will keep you guys posted for updates.

Figure Display Cabs | Update 1 (1)
Figure Display Cabs | Update 1
Figure Display Cabs | Update 1 (2)
Figure Display Cabs | Update 1
Figure Display Cabs | Update 1 (3)
Figure Display Cabs | Update 1
Figure Display Cabs | Update 1 (4)
Figure Display Cabs | Update 1
Share

Let's Discuss!